The issue
The Carbon Risk Real Estate Monitor (CRREM) is consulting on a significant revision to how it develops energy pathways for buildings. Following input from more than 300 practitioners and technical experts, the October 2026 concept paper proposes an independent measure of energy performance alongside carbon performance. Consultation closes on 4 December 2026.
The central change is to derive energy pathways directly from the International Energy Agency’s Net Zero building energy demand projections. Currently, they are derived from carbon pathways. Separating them would make energy efficiency a clearer transition risk signal, independent of how quickly the electricity grid decarbonises.
The proposed methodology also weights pathways by projected floor area and differentiates energy uses by property type and climate. Heating and cooling requirements would reflect projected temperature changes through 2050. A new Technical Feasibility Test would examine whether pathway endpoints are plausible against building performance evidence. This tests technical achievability; investment viability still requires financial analysis.
Existing CRREM pathways remain the active reference. Revised pathways are expected in Q4 2027, following further consultation. CRREM explicitly advises against using the concept methodology or illustrative pathways for decisions, target-setting or reporting.
Why should businesses care?
A cleaner electricity grid can reduce a building’s emissions while its energy consumption remains unchanged. The proposed approach would make that distinction more visible. Owners would have a stronger basis for examining efficiency improvements alongside electrification.
For capital planning and investment committees, the practical implication is to connect pathway assessments with the work required at each asset. CRREM already encourages owners to compare forward-looking capital expenditure plans against its pathways. The proposed revision strengthens the case for understanding which building systems drive consumption and what improvements are achievable.
Consider an office approaching heating-system replacement. Improving insulation and controls could reduce the capacity required from a future heat pump. The investment assessment should compare these measures together, account for equipment life and test performance under future heating and cooling conditions. Evaluating each measure independently can overstate combined savings or miss a better sequence.
The resulting plan needs a financial assessment covering capital expenditure, operating savings and disruption.
What should businesses be doing?
Businesses can strengthen ongoing transition planning under the active pathways and prepare to update their analysis when any approved revisions take effect.
- Establish a reliable baseline.
- Reconcile whole-building energy data, including tenant consumption, with the appropriate floor area and property classification.
- Record the pathway version and assumptions so methodology changes can be distinguished from actual improvements.
- Develop integrated intervention pathways.
- Compare annual energy and emissions trajectories for alternative retrofit packages against the active CRREM pathways.
- Account for interactions between measures and sequence work around equipment replacement or refurbishment windows.
- Build the investment and financing case.
- Assess whole-life cash flows, including disruption and replacement costs; test sensitivity to energy prices and delivery performance.
- Map annual funding needs against available capital, potential incentives and debt capacity. Identify funding gaps before committing the programme.
- Manage delivery and future revisions.
- Assign responsibility for implementation and verify actual savings against the investment case.
- Prepare to reassess priorities when final pathways are released, retaining a clear record of changes to assumptions and budgets.
References
- CRREM Foundation — Energy Pathway Methodology Revision: Concept Paper for Public Consultation, October 2026.
- CRREM Foundation — Energy Pathways consultation and release timetable.
- CRREM Foundation — How the revised methodology works.
- CRREM Foundation — Assessment Guide, version 1.03, May 2026.